How to achieve Small injection molding machine A quick touch change? For the injection molding field, the theoretically achievable productivity is 95%. In fact, the productivity of some injection molding enterprises is far less than this level. One of the main reasons is that it takes a lot of precious time to replace the mold shell.
Why can't "quick mold change" be accepted by small and medium-sized injection molding machine customers?
In fact, the methods and facilities for rapid mold change have been used in the plastic machinery industry for 30 years. In a broad sense, the rapid mold change system software is specially used on plastic machines with heavy loads. However, for large, medium and small tonnage plastic machines, most of them still use the method of manual mold changing; As we all know, the smaller the tonnage of the plastic machine, the higher the proportion of the time required to replace the mold shell in the total manufacturing time.
According to the market survey data, most customers do not deliberately refuse the quick change mold system software, but the key is that they do not have a good grasp of the equipment and planning scheme of the relevant enterprises, or they are more likely to come from a complex thing, whose newly developed technology and facilities are repelled.
At first glance, "quick mold change" may be more complex and difficult to start. Because it cannot replace the traditional code mold clamp with "hydraulic press or magnetic fixture", or "use quick plug connector to connect oil channel, water channel and power circuit", it is just a change in manufacturing process and requires cooperation from all departments. Although it will cost a lot of financial and material resources to achieve the "purpose". Fast model change ", things have been gradual, step by step business strategy is more important, step by step success, the benefits will be presented one by one. According to the customer's own situation, the time that the processing plant can reach determines the time required to carry out the new project of "rapid mold change".