Start a new journey in the auspicious year of the dragon

2025-02-19        zero

At the end of the Spring Festival holiday, Liansheng Precision has fully resumed normal production.

Liansheng sincerely wishes colleagues from all walks of life, new and old customers, supplier partners, prosperous business in the Year of the Dragon, and abundant financial resources!

In order to ensure the normal operation of the equipment and the rapid return of the enterprise to work and production, we provide you with a post holiday equipment startup guide to help you start the joint upgrading equipment smoothly and safely.

If there are any after-sales problems with the machine, please contact the local service team of Liansheng at any time.


LANSON

01

Inspection, cleaning and maintenance before startup


  • Whether the power cord and cable are intact, and whether the electrical connection is tight.

  • Check whether the moving parts of the equipment are normal, especially the machine hinge parts, formwork parts, track or steel strip lubrication parts.

  • Whether the lubricating system needs to add or replace lubricating oil. If the shutdown time is long, it can be lubricated manually for 3~5 times.

  • Ensure that all pneumatic and hydraulic systems are tightly connected without leakage.

  • Check all safety protection devices, peripheral auxiliary machines, sensors and instruments, and ensure their normal operation.

  • Remove all sundries, oil stains and dust in the equipment and surrounding environment to ensure smooth operation of the equipment.




LANSON

02

Preheating equipment


Please preheat the equipment before formal production. yes It helps to eliminate moisture inside the equipment, reduce thermal stress and ensure product quality.




LANSON

03

Commissioning and testing and record maintenance

  • Before officially putting into production, please carry out some testing and commissioning work to ensure the normal performance of the equipment. Check the product quality to ensure that there is no abnormality in the injection process.

  • Record equipment operation data, establish maintenance files and conduct regular maintenance according to equipment instructions.